St Nicholas Orthodox Church, McKinney Texas
Building Project Chronology
Our building project began 12 years ago, when we established a building fund and started looking for a location. For a few years in the '90's, the parish income allowed us to grow the building fund rapidly, and donations to date total approximately $110,000. The total cost of our basic project will be approximately $270,000. We have secured a loan for $160,000 to cover the remaining costs. We will need to raise at least an additional $28,000 to pay for parking, landscaping, irrigation, and other requirements the city has told us must be fulfilled before we obtain an occupancy permit. In time, we plan to have an iconostasis built and icons painted, most likely from local Orthodox Christians.
A building
committee, led by a licensed engineer and a registered
professional land surveyor, laid out the criteria for a
viable land purchase, and we spent many years looking
for a good piece of real estate in the Dallas area. In
the mid-1990's, we even looked at properties in
Arlington and Fort Worth. After a long and difficult
search, we decided in the fall of 2006 that the City of
McKinney would provide us the best opportunity to find a
suitable piece of land within our price range. In April
of 2007, we purchased a plot of land in historic
downtown McKinney, though we did not yet have the means
to build and were undecided about whether this was the
best location.
As time
went on, it became clearer that building in McKinney is
our best option. We will be the only Orthodox church
within 15 miles, in a growing and vibrant community.
When you look at a map of churches in the area
(URL), there is a “hole” in
McKinney. We feel that we are helping the DFW community
best by locating there.
Once we made up our minds to build a temple on our land, we
began to look for a lender, and we had a lot of trouble
getting anyone to believe in us. The
large national banks did not take us seriously, but we
found a friend in a local bank whose vision is to
build up the community in which they live and do business.
Independent
Bank (https://www.independent-bank.com/index.html)
has believed in us, and we have a superb working
relationship with them. When other banks said no, they
found a way to say yes.
This has
been a long and difficult journey, and the turning point
for us was when we began to really apply ourselves to
prayer. It is almost a cliché to say that we
should pray about something, and we certainly did, but
things really changed after we established a regular
weekday liturgy in which we pray for all of our
parishioners by name during in the Augmented Ectenia. We
did not specifically pray for a new temple or land, but
instead, have regularly, each
Wednesday, served the liturgy and
asked God’s mercy for everyone in our flock.
This additional weekday liturgy is the most important
turning point in our chronology. We have since added
a weekly Molieben for the parish, served at
the construction site.
T
imeline
1994
Deacon Seraphim Holland becomes a resident of Texas, on the very day of the glorification of St John Maximovitch. Fr Seraphim had been asked by Bishop Hilarion (now our Metropolitan) to come to Texas to become the pastor of a small mission in Dallas that had been faithfully holding reader’s services. We immediately began holding reader’s vigils on Saturday night, with typica and a meal on Sunday.
1995
Fr Seraphim ordained to the priesthood (March 6/19, the second Sunday of Great Lent).
1997
Building Fund established. Search for a land or a suitable property begun.
2007
Land purchased in McKinney. There is a long lapse in years between this and the previous entry, but there was really a lot going on. We looked at zillions of properties in zillions of places all over the Metroplex. Nothing was suitable. Finally, we found something, almost on a whim, in McKinney, and we were off and running (uphill).
January, 2008
The week after Nativity, we began our weekly weekday liturgies. This was made possible because Fr Seraphim no longer was working fulltime. The highlight of this liturgy is that we pray by name for everyone in the parish during the Augmented Ectenia.
February, 2008
Dissatisfied with the original design, which had no provision for a church hall, we selected our Architect /Designer:
Tim Bonner and Associates. (http://www.bonnerassoc.net)
Also: Builder/Consultant selected: Anderson/Sargent http://www.andersonsargent.com
They are one of the first "LEED" (Leadership Energy Efficient Design) builders in the area.
Design is based on the "Raising of St. Lazarus", the
oldest wooden temple in Russia
(above). It was originally at Muromansky
Monastery and now resides in the Kizhi open air
museum
Dr McBride, retired professor of Architecture
University of Texas at Arlington helped us
immensely during this design phase. He
is Sub-Deacon at Holy Trinity Greek Orthodox
Church.
March, 2008
Cross erected on the Sunday of the Cross (3rd Sunday of Great Lent).
May 2008
Outdoor Divine Liturgy on the land on St. Thomas Sunday (April 21/May 4), with a picnic afterwards.
http://orthodox.net/redeemingthetime/2008/05/18/liturgy-on-the-land-slideshow-and-movie-medley/
June, 2008
Attempts to get a building loan begun. During discussion with Independent Bank, our eventual lender, it became apparent that we needed to account for a more substantial regular income. We instituted our first call for pledges, and the parish responded extremely well, increasing our income by fifty percent, which gave us enough income for the bank to consider us.
September, 2008
Loan approved.and building plans submitted to the city of McKinney for approval.
July, 2009
Building permit obtained.
Construction begun.
August 2009
Letter sent appealing for benefactors: We wish to raise, if it be God’s will, $40,000 by asking 400 benefactors to give us alms of $100 or more each. We want to give our benefactors something back for their alms. Like the Apostle Peter, “Gold and silver have (we) none”, but we offer you our perpetual prayer. …..
Drilled holes for the piers and poured concrete.
Father Seraphim moonlighting at the construction site. J
September, 2009.
Plumbing and Electrical wiring installed and approved.
Foundation poured.
Walls mostly completed.
Lesser blessing of the waters
October, 2009.
Walls nearly completed.
The Deaconesses after a Thursday evening moleben
Apse constructed.
Rain... Rain... Rain... We continued to pray our Moliebans and Liturgies, including our twice-monthly children's liturgy.
A homily at a children’s liturgy.
November2009
Roof framing done.
Plywood roof installed. Interior framing done. Solea installed.
December2009
Plumbing, Electrical and HVAC installed.
January20 10
Iconostasis and altar framing completed, with electrical. Insulation installed. Roof completed. Work begun on parking lot.
[photos to be added]
Dome finished and shipped.
March 2010
Anticipated date we will be able to use the temple.